LRC ConstructionCeiling finishes of the clerestoryCeiling tile, soffit paint, fire sprinkler finishes,& suspended light fixtures are installed. The scaffold system used to perform work at 40'plus above the library floor, will be removed beginning the week of Sept. 2. |
|
|
|
|
||||||
|