![]() |
|
|
|
|
|
|
|
     
|
|
|
LRC ConstructionConcrete FlooringThe 1st floor bi-level concrete slab is poured. Structural steel is near complete including metal stairs to 2nd floor. |
|
|
|
|
||||||
|
Last updated October 06, 2005 |
||||||