LRC ConstructionSteel frame nearing completion
Structural steel erection is almost complete. Eagle Iron should finish
installing beams and columns today. The The upper level concrete slab (main entry lobby and art gallery area) is scheduled to pour on Monday, 12/09/02. Everything is running smooth and on schedule. |
|
|
|
|
||||||
|